PROJECTS

NEW

DRYBOXSYSTEM™ is an integrated active waterproofing system, with guaranteed tightness, specifically designed to extend the life of newly constructed concrete structures.

DISCOVER DRYBOXSYSTEM™

New Policlinico Hospital

Milan, Italy

New University Residence

Building U10, Milan Bicocca

Project carried out in collaboration with S.A.C. Società Appalti Costruzioni and CMC Ravenna.

Waterproofed structure: 11,800.00 m2
Concrete waterproofed with Drybox System: : 8.900,00 m3

Bologna Business School

Mario Cuccinella, Bologna

Project carried out with Ing. Ferrari on a project signed by the architectural firm Mario Cucinella Architetti

Waterproofed structure:5,500.00 m2
Concrete waterproofed with Drybox System: 3,400.00 m3

Borio Mangiarotti

Via Cefalonia 18, Milan, Italy

Projects carried out in collaboration with Borio Mangiarotti S.p.a.

Waterproofed structures: 6,500.00 m2
Concrete waterproofed with Drybox System: 2,900.00 m3

Borio Mangiarotti

Viale Montello 6, Milan

Projects carried out in collaboration with Borio Mangiarotti S.p.a.

Waterproofed structures: 6,500.00 m2
Concrete waterproofed with Drybox System: 2,900.00 m3

Borio Mangiarotti

Via Jenner TOG Center, Milan, Italy

Projects carried out in collaboration with Borio Mangiarotti S.p.a.

Waterproofed structures: 6,500.00 m2
Concrete waterproofed with Drybox System: 2,900.00 m3

Borio Mangiarotti

Via Arrivabene, Milan, Italy

Projects carried out in collaboration with Borio Mangiarotti S.p.a.

Waterproofed structures: 6,500.00 m2
Concrete waterproofed with Drybox System: 2,900.00 m3

Ferrari S.P.A

Maranello, Italy

Project carried out in cooperation with Ing. Ferrari S.p.a.

Waterproofed structure:7,000.00 m2
Concrete waterproofed with Drybox System: 5,000.00 m3

New residences

Former Nora Area, Milan

This construction site was carried out in cooperation with SMV COSTRUZIONI SRL

‍Waterproofed structure
: 6,500.00 m2
Concrete waterproofed with Drybox System:2,900.00 m3

Hippodrome

Milan, Italy

Project carried out in collaboration with Facchetti Costruzioni S.p.a.

Waterproofed structure:7,600.00 m2
Concrete waterproofed with Drybox System: 3,000.00 m3

Gymnasium and High School

Sigonio, Modena

Project carried out in cooperation with CMB (Cooperative of Masons and Laborers of Carpi)

Waterproofed structure:9,450.00 m2
Concrete waterproofed with Drybox System: 4,600.00 m3

Winter Wonderland

Al Maha Island, Qatar

Client: Qatari Dier, Elegancia GroupDesign firm: Gulf Consulting GroupContractor: Urbacon Contracting Company

Concrete waterproofed with Drybox System: 40,000.00 m2

The Pearl Residential towers

Qatar

Project carried out in collaboration with HTCO
Client: Sheik Mohamed Abdul Rahman Hamad Al Thani
Design Studio: HTCOContractor: Saltos Trading & Contracting

Skala Tower Hotel & Residential

Qatar

Project carried out in cooperation with Sigma Contracting & Trading.Client: Ariane
Design firm: Al FereeJ Consultancy
Client: gma Contracting & Trading

Concrete waterproofed with Drybox System: 6,000.00 m3

Katib Celebity University

Izmir, Turkey

Project carried out in cooperation with Doyap.
Client: Ariane

Waterproofed structure: 6,000.00 m3

Istanbul residence building

Turkey

Project carried out in cooperation with Istanbul Proje Yapi

Waterproofed structure: 1,000.00 m3

Camsan Park

Avym, Turkey

Project carried out in cooperation with Camsan Gayrimenkul.

Waterproofed structure: 2,500.00 m3

CONCESIO WASTEWATER TREATMENT PLANT

Concesio, Brescia

Project carried out in collaboration with Facchetti Construction for Azienda Servizi Valtrompia

Waterproofed structure 20,000.00 m2
Concrete waterproofed with DRYBOX SYSTEM::8,000.00 m3

WATER TREATMENT PLANT

Pavia

Project carried out in collaboration with Mezzanzanica S.p.a. for Pavia Acque

Waterproofed structure: 2,000.00 m²
Concrete waterproofed with DRYBOXSYSTEM™: 2,500.00 m³

ANDRIA ACQUEDOTTO PUGLIESE WASTEWATER TREATMENT PLANTS

Andria, Italy

SAN MAURIZIO CANAVESE WASTEWATER TREATMENT PLANTS

Turin, Italy

Project carried out in collaboration Impresa Ruscalla Renato spa for Smat Torino

CASALBATE WASTEWATER TREATMENT PLANT

Lecce

Project carried out in collaboration with AQP - Acquedotto Pugliese
Lifting station

DIGESTER WASTEWATER TREATMENT PLANT

Andria, Italy

Project carried out in collaboration with AQP - Acquedotto Pugliese

ACCUMULATION TANK HYDRO-SYSTEM

Mestre

Project carried out for AcqueVenete

WATER TRANSFER TANKS IN MELEN

Turkey

MONTAGNANA ACCUMULATION TANKS

Padova, Italy

Project carried out in collaboration with Impresa Abbadesse for Acque Venete 

Floodwater pool Scama Strade

Milan, Italy

Project carried out in collaboration with Scama Strade for CAP Holding

Waterproofed concrete with DRYBOXSYSTEM™: 2,500.00 m³
Waterproofed structure: 2,000.00 m²

REPAIR/RESTORATION
DISCOVER CRACK REPAIR SYSTEM

HYDROPOWER PLANT

Pon San Martin, Aosta, Italy

UNDERGROUND HOTEL LE MERIDIEN

Qatar

HIGHWAY TURIN - AOSTA

Aosta

MINISTRY BUILDING

Qatar

PROTECTION

PRADA FOUNDATION

Milan, Italy

UNIVERSITY OF PISA

Pisa

FORMER GUIDETTI LABORATORIES

Pisa

PROTECTION